YOVON Semi-Auto Curling Machine Manual
parameter
tube diameter | 25-150mm |
tube height | 20-300mm |
tube thickness | 1-4mm |
efficiency | 20 |
pusher mode | from the bottom up |
size | 550*500*1600 |
1. counter
2. temperature control (for temperature preset and measurement)
3. fine tuning nut
4. hand wheel for the whole height adjustment
5. pressure gauge
6. curling speed adjustment
7. curling mould
8. heating base
9. mould height adjustment
10. lid mould auto up and down switch
11. power switch
12. heating switch
13. middle screw
14. side screw (for up)
15. side screw (for down)
(When adjusting the rod up and down, loosen sides screws 14 and 15, and
tighten the middle screw 13; after adjusting the rod to match the height of
the paper tube, tighten the screws 14 and 15 , then loose the screw 13.)
16. time adjustment gauge
Operation steps
1.Connect the air pipe first, turn on the air pressure gauge, and let the cylinder of curling machine fully flow pressure air.
2.Then plug in the 220∨ power, turn on the No. 11 power switch, and turn on No. 12 base heating switch, heating for 30-40 minutes, until temperature number reach to the preset green temperature numbers 100~120ºC, depending on the wall thickness and the density of paper tube, flexibly preset the temperature to be the most suitable,then a better tube curling result can be reached.
3. Adjust the whole height of the rod and the traverse height of the lid mould according to the height of paper tube.
How to adjust the height of press mold:
Place the paper tube into the groove of the curling mold. (Loosen No. 14 and No. 15 screws, tighten No. 13 screws. Adjust to match the height of the paper tube-just touch the top side of paper tube, then loose No.13 screw) Turn the hand wheel of No.4 upwards, the lid mould will move up, and turn downwards the lid mould will move down. The best point is to touch the upper end surface of the paper tube.
4. Once the press lid traverse adjustment is done, press the foot switch to test the curling effect. If the curling is satisfied, press No. 10 switch to let the press lid mold automatically go up and down. Operator only needs to put the paper tube into the curling mould by hand and pedal the foot switc h.